10 days in France in May allowed a start to be made on the electrical wiring, the ceilings were removed to reveal wood worm, a concrete surface was layed on the stone floor, at last we got hot water, UK TV Reception courtesy of Sky and some painting done. A tiring experience in very hot weather.
Why not contact us on La.Vacherie@wanadoo.fr