La Vacherie (The Nasty Trick) May 2001

10 days in France in May allowed a start to be made on the electrical wiring, the ceilings were removed to reveal wood worm, a concrete surface was layed on the stone floor, at last we got hot water, UK TV Reception courtesy of Sky and some painting done. A tiring experience in very hot weather.

Why not contact us on La.Vacherie@wanadoo.fr

 

DC0003L.jpg
Electrical Wiring
DC0004L.jpg
The Railroad runs
through the middle of the house
DC0005L.jpg
Woodworm
DC0006L.jpg
re-wiring
DC0007L.jpg
more re-wiring
DC0008L.jpg
progress to hot water
DC0009L.jpg
TV
DC0010L.jpg
eating, sleeping and chaos
DC0011L.jpg
is this progress?
DC0012L.jpg
Sat dish up
DC0013L.jpg
painted the black wall
DC0014L.jpg
better roof drainage
DC0015L.jpg
gates painted
DC0016L.jpg
house painted
DC0017L.jpg
needs a new door

Home | Previous Page | Next Page